Lắp đặt Đèn ngầm Các vấn đề về chất lượng thi công của đèn ngầm hoặc đèn thủy sinh về cơ bản là hiện tượng thấm nước của đèn và rò rỉ nước ở hộp đấu nối giữa của đường dây.

do đó, khi lập quy hoạch xây dựng hệ thống đèn ngầm, đèn thủy sinh, the power force line should borrow the applicable connection system to minimize the intermediate joint; when the intermediate joint is necessary, it’;s necessary to find a centralized connection box at the applicable position on the ground.

The beacon- side power force side connector of the beacon is concentrated in the junction box connection; when the beacon is unpacked and equipped with light source and wiring on point, the sealing position of the beacon may be lowered due to environmental and indecorous operation, leaving a quality hazard, and the product is needed to be packed when necessary.

A good light source with a length of beacon base is critical. do đó, a reasonable and comprehensive construction plan is of great significance to ameliorate the quality of the design.

1. Before installing the underground lights, the power must be cut off first. This is the first step in the installation of all electrical outfit and is the base for safe operation.

2. Before installing the underground lights, the colorful factors used in the lighting should be arranged first. The underground lightsis a special geography LED light that’;s buried underground. formerly installed, it’;s veritably worrisome to install corridor and refill it. So be prepared before installation.

3. Before installing the underground lights, first drill a hole according to the size of the bedded part, and also fix the bedded part with concrete. The bedded part serves to insulate the LED from the main body of the beacon and the soil, and can insure the service life of the underground lights.

4. Before installing the underground lights, you should bring your own IP67 or IP68 wiring device to connect the external power input to the power string of the beacon body. cũng, the power cord of the LED buried beacon requires a VDE- certified leakproof power cord to insure the service life of the LED buried beacon.

微信图片 20211102110955

Di chuyển lên đầu

Dự án của bạn cần được tư vấn và hỗ trợ?

Liên hệ với chúng tôi ngay hôm nay để nhận được đánh giá và tư vấn kinh doanh miễn phí.

Lacelesty!

Cung cấp miễn phí
giải pháp chiếu sáng

dự án của bạn cần được tư vấn và hỗ trợ?


cung cấp hỗ trợ và tư vấn chuyên gia.